Clinical Site Management Services

Clinical Site Management · India

GCP-Compliant Site Management for Sponsors Running Trials in India

Shen Clinical Services provides end-to-end clinical site management in India: feasibility, investigator and site selection, ethics committee coordination, patient recruitment, risk-based monitoring with source data verification, and close-out. We reduce sponsor risk through documented site qualification, CRA oversight and inspection-ready investigator site files aligned with ICH-GCP and NDCT Rules 2019.

Clinical research associate reviewing samples at an Indian clinical trial site laboratory

NDCT Rules 2019CDSCO timelines built into every site plan

ICH E6(R3) GCPRisk-based quality management and monitoring

CTRI RegistrationProspective registration managed for every study

ICMR GuidelinesEthical conduct and informed consent standards

The Sponsor Challenge

Where Trials in India Lose Time, and How We Prevent It

Sponsor friction pointWhat typically goes wrongHow Shen Clinical Services handles it
Delayed site activationEthics committee meetings run on fixed calendars, and budget or contract negotiation is done one step at a time. Sites are often selected before anyone confirms the patient pool exists.We run ethics committee submissions, CTRI registration and site contract negotiation in parallel, not one after another. We only select sites with a registered ethics committee and a confirmed meeting schedule, and an activation tracker with set milestones goes to the sponsor every week.
Recruitment shortfalls and drop-outsFeasibility answers are optimistic estimates rather than actual patient counts. Once enrolled, patients drop out because of travel burden and missed visit windows.We verify patient pools against site records and past enrolment performance before committing a site. Retention measures include visit reminders in local languages, travel reimbursement within ethics-committee-approved limits, and a named coordinator for each patient cohort.
Data queries and transcription errorsSource documents don’t match what’s entered in the electronic data capture (EDC) system, and query backlogs build up before database lock.We monitor on a risk basis (ICH E6(R3)), targeting source data verification at the data points that matter most. Coordinators are trained before the first patient enters, and query turnaround is tracked against an agreed target for each site.

Our Process

Our Clinical Site Management Process

Four phases, one accountable team, from the first feasibility call to an inspection-ready close-out.

Illustration of clinical site management: investigator, site staff and trial participants

PHASE 01

Site Feasibility, Investigator Selection and Ethics Committee Coordination

We run each clinical trial feasibility study against real site data: patient counts drawn from the site’s own records, past recruitment performance, how the investigator performed in earlier studies, and the ethics committee’s meeting cycle. Only qualified sites, with registered ethics committees and suitable infrastructure, go on the shortlist. We then coordinate ethics committee submissions, CTRI registration and site agreements in parallel to shorten the time to activation.

PHASE 02

Accelerated Patient Recruitment and Retention

Our patient recruitment strategies for clinical trials start from the protocol’s eligibility criteria and work back to where those patients are actually seen: specialist clinics, referral networks and site databases. We support informed consent in the participant’s language, including audio-video recording of consent where the NDCT Rules require it, and track screen-failure and drop-out rates for each site every week.

Clinical trial site team of investigators and research coordinators
Clinical research associate monitoring trial data for source data verification

PHASE 03

Clinical Site Monitoring and Source Data Verification (SDV)

As a site monitoring CRO in India, we deliver GCP-compliant site monitoring under a risk-based monitoring plan. That plan combines on-site visits, remote and central monitoring, and targeted SDV. Our clinical research associates (CRAs) check consent documentation, safety reporting timelines, accountability for the investigational product, and that the protocol is being followed, then escalate any deviation with a documented corrective and preventive action (CAPA).

PHASE 04

Site Close-out and Regulatory Inspection Readiness

Close-out includes reconciling the investigational product and arranging its return or destruction, completing the investigator site file, notifying the ethics committee, and updating the trial’s CTRI status. We prepare sites for inspection by CDSCO or other regulators through mock audits and document checks, and confirm records are archived for 5 years after study completion, or 2 years after the drug batch’s expiry date, whichever is later.

Laboratory technician handling trial samples during site close-out and inspection preparation

Regulatory Compliance

Proven Compliance With India’s Clinical Trial Rules

Every site we manage works to the timelines set by CDSCO under the New Drugs and Clinical Trials (NDCT) Rules, 2019. We build these deadlines into each site’s monitoring plan.

Regulatory requirementTimeline set by the rulesHow we enforce it at site level
Clinical trial application review30 working days for domestic trials; 90 working days for global trialsSubmission documents prepared alongside site selection, so sites are ready to activate on approval
Ethics committee registration45 working daysOnly sites with ethics committees already registered with CDSCO are shortlisted
Serious adverse event (SAE): initial reportWithin 24 hours of the eventSite staff trained in SAE reporting before activation; CRA confirms the report within the window
SAE: analysed follow-up reportWithin 14 daysCRA tracks every open SAE against this deadline
Ethics committee SAE and compensation recommendationWithin 30 days of receiving the reportEthics committee communications tracked in the monitoring log
Compensation payment after a regulator’s orderWithin 30 days of the orderSponsor notified on the day the order arrives
Trial record retention5 years after study completion, or 2 years after the drug batch’s expiry date, whichever is laterArchiving checked as part of close-out, with document storage verified

Standards every site follows: NDCT Rules 2019 (as amended), ICH E6(R3) Good Clinical Practice, mandatory CTRI registration, and the ICMR National Ethical Guidelines.

Resource Spotlight

Planning a trial in India for the first time? See our regulatory guidance and compliance services for support with CDSCO approval, CTRI registration and ethics committee requirements. Our medical writing services prepare the protocol, informed consent forms and ethics committee documents. For full-service support, see our clinical trial services in India.

Need Sites That Recruit on Schedule?

For trials in planning: get a site feasibility assessment with verified patient pools, investigator track records and a written activation timeline.
For trials that are behind: our site rescue team reviews under-performing sites, identifies replacement sites and works on recovering your recruitment timeline.

+91 98968 89927 · info@shenclinicalservices.com · A 302, Urban Square, Sector-62, Gurugram, Haryana 122098

Scroll to Top